Afficher la notice abrégée

dc.contributor.advisorBreysse, Denys
dc.contributor.advisorNiandou, Halidou
dc.contributor.authorMEHDIZADEH, Rasool
dc.contributor.otherBoissier, Daniel
dc.contributor.otherMorand, Denis
dc.contributor.otherTaillandier, Franck
dc.date2012-06-04
dc.date.accessioned2020-12-14T21:15:49Z
dc.date.available2020-12-14T21:15:49Z
dc.identifier.urihttp://ori-oai.u-bordeaux1.fr/pdf/2012/MEHDIZADEH_RASOOL_2012.pdf
dc.identifier.urihttps://oskar-bordeaux.fr/handle/20.500.12278/22496
dc.identifier.nnt2012BOR14521
dc.description.abstractDepuis quelques années, de nombreux travaux de recherche se sont portés sur le domaine de la gestion des risques pour les projets de construction. Les projets de construction font intervenir de nombreux acteurs dont les intérêts et les besoins doivent être pris en compte dans le système décisionnel afin d’assurer le succès du projet.Une RBS (Risk Breakdown Structure) est une représentation hiérarchisée des risques d’un projet. Elle est composée de catégories de risque qui explicitent les différents domaines pouvant être source de risque. Ce type de représentation présente de nombreux avantages, la rendant ainsi adaptée à la gestion des risques dans les projets de construction : elle offre une vision synthétique des risques, elle est compatible avec la nature dynamique et évolutive des risques et elle permet à chaque acteur du projet d’avoir sa propre vision des risques. Cependant les RBS présentent aussi des inconvénients : il n’existe pas de consensus sur la façon de les construire, la définition des catégories de risque est souvent floue et non partagée, enfin il n’y a pas de règles permettant de propager les évaluations (qualitatives ou quantitatives) dans les branches de la structure.Dans cette thèse, nous proposons une méthodologie pour le développement de RBS sur mesure, c’est à dire adaptées à l'étape et au niveau de développement du projet et permettant d'offrir un point de vue adapté aux différents acteurs. Cela permet de poser les bases d’une approche dynamique, multi-échelle, multi-perspective dans laquelle chaque acteur, peut, dans chacune des phases, se concentrer sur certains risques par une décomposition adaptée de sa RBS. Cela permet d'identifier et de gérer les risques liés au projet de construction d'une façon plus formelle, plus efficace et plus systématique.En parallèle, des efforts ont porté sur le développement d'une méthode avancée pour l'analyse et la propagation des valeurs de risque par les RBS. Le but était de développer une approche cohérente afin d’obtenir des résultats réalistes sans souffrir des faiblesses habituelles des méthodes disponibles dans la littérature. La méthode combine les approches quantitatives et qualitatives, permettant ainsi à l'utilisateur de choisir, selon l'information disponible et la précision souhaitée le choix du type d'évaluation le plus adapté.Une attention particulière a été portée quant au développement de la base de connaissances, afin d'assurer la cohérence des données. La base de connaissance est composée de trois types d’objets principaux : les événements risqués, les catégories de risque et les arbres élémentaires. Elle a été alimentée par une analyse approfondie de la littérature. Cette base de connaissances est suffisamment générale pour couvrir tous les projets de construction et suffisamment précise pour être adaptée à un projet particulier. Elle fournit un langage commun avec lequel les risques liés au projet peuvent être décrits et discutés. Le processus de construction des RBS est basé sur une logique multicritère (degré de développement, satisfaction des utilisateurs, contraste des valeurs de risque) permettant de comparer les différentes RBS entre elles. La structure de la base de connaissance est conçue de façon à faciliter sa mise à jour et ses développements ultérieurs.MOTS-CLÉS: , , construction, méthodologie, bases de données.
dc.description.abstractEnIn recent years, intensive research and development have been done in the area of construction projects risk management. The construction projects involve numerous participants whose interests and demands need to be considered in the managerial decision-making to ensure the success of the project. Risk Breakdown Structure is a hierarchically organized depiction of the identified project risks arranged by risk categories and subcategories that identifies the various areas and causes of potential risks. This type of representation has many advantages and is a suitable tool especially for risk management of construction projects since: it offers a synthetic view on risks, each stakeholder can have his own view on the project and it is compatible with evolutionary and dynamic nature of project risks. However, RBS suffers several drawbacks such as lack of consensus on how to develop an RBS for a new project, lack of clarity and inconsistencies in definition of risk categories and lack of rules enabling transfer of qualitative/quantitative information of risks across the tree. In this PhD thesis, we propose a methodology for the development of tailor-made RBS's which are adapted to several constraints: being fitted to the stage and degree of development of the project, being able to offer different views for the different partners. This makes it possible to establish a dynamic, multi-scale and multi-perspective approach in which each partner, at each desired stage, can focus on selected specific risks and divide the RBS's up into a greater number of subcategories in specific fields. It allows to identify and manage the construction project risks in a more formal, efficient and systematic way. In parallel, efforts have been devoted to the development of an advanced method for analysis and propagation of risk values through RBS. The aim was to develop a more coherent approach in order to get more realistic results without suffering from the usual weaknesses of available methods in literature to calculate the risk value of categories in RBS. The method combines consistently the quantitative and qualitative approaches, allowing the user to choose the best one for risk assessment at any level based on the available information and required accuracy.Special care was taken in the development of the risk knowledge database in order to ensure the data's consistency. A database which has three interactive components of risk events, risk categories and micro trees, and have been developed based on a thorough analysis of literature. This knowledge base is general enough to cover all construction projects but at the same time, specific enough to be adapted to a given particular project. This database provides a common language within which the project risks can be described and discussed. The RBS rebuilding process is driven in such a way as to make it possible to compare different possible RBS's according to several criteria (degree of development, user satisfaction and highlighting the contrast of risk values). The database is constructed in such a way as to facilitate further developments and updating.
dc.language.isoen
dc.subjectHiérarchie des risques
dc.subjectGestion des risques
dc.subjectConstruction
dc.subjectMéthodologie
dc.subjectBases de données
dc.subjectDynamique
dc.subjectMulti-échelle
dc.subjectMulti-perspective
dc.subject.enRisk Breakdown Structure
dc.subject.enRisk management
dc.subject.enConstruction
dc.subject.enMethodology
dc.subject.enDatabase
dc.subject.enDynamic
dc.subject.enMulti-scale
dc.subject.enMulti-perspective
dc.titleGestion dynamique et multi perspectives des risques pour les projets de construction : l'apport d'une arborescence hiérarchique des risques "à la carte"
dc.title.enDynamic and multi-perspective risk management of construction projects using tailor-made Risk Breakdown Structures
dc.typeThèses de doctorat
bordeaux.hal.laboratoriesThèses de l'Université de Bordeaux avant 2014*
bordeaux.hal.laboratoriesInstitut de mécanique et d'ingénierie de Bordeaux
bordeaux.institutionUniversité de Bordeaux
bordeaux.institutionBordeaux INP
bordeaux.type.institutionBordeaux 1
bordeaux.thesis.disciplineGestion des risques
bordeaux.ecole.doctoraleÉcole doctorale des sciences physiques et de l’ingénieur (Talence, Gironde)
star.origin.linkhttps://www.theses.fr/2012BOR14521
dc.contributor.rapporteurEinstein, Herbert H.
dc.contributor.rapporteurMarle, Franck
bordeaux.COinSctx_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.title=Gestion%20dynamique%20et%20multi%20perspectives%20des%20risques%20pour%20les%20projets%20de%20construction%20:%20l'apport%20d'une%20arborescence%20hi%C3%A9rarchique%20des&rft.atitle=Gestion%20dynamique%20et%20multi%20perspectives%20des%20risques%20pour%20les%20projets%20de%20construction%20:%20l'apport%20d'une%20arborescence%20hi%C3%A9rarchique%20de&rft.au=MEHDIZADEH,%20Rasool&rft.genre=unknown


Fichier(s) constituant ce document

FichiersTailleFormatVue

Il n'y a pas de fichiers associés à ce document.

Ce document figure dans la(les) collection(s) suivante(s)

Afficher la notice abrégée