Afficher la notice abrégée

dc.rights.licenseopenen_US
dc.contributor.authorBABABEIK, M.
dc.contributor.authorFARJAD-AMIN, M.
dc.contributor.authorKHADEMI, N.
dc.contributor.authorBAGHERI, M.
hal.structure.identifierGroupe de Recherche en Economie Théorique et Appliquée [GREThA]
dc.contributor.authorZERGUINI, Seghir
IDREF: 082069476
dc.date.accessioned2020-02-16T20:05:08Z
dc.date.available2020-02-16T20:05:08Z
dc.date.issued2019
dc.identifier.issn23521457en_US
dc.identifier.urihttps://oskar-bordeaux.fr/handle/20.500.12278/40
dc.description.abstractEnThe scheduling of maintenance operations in railway is a major concern for both maintenance planners and train dispatchers since it requires the track to be blocked and the rail traffic to be disrupted. This paper provides a mathematical programming model aimed at adjusting the timetable of trains in a single track according to maintenance operations. The uncertainty of the maintenance activities might cause delays in the initial maintenance plan which is further overlapped with pre-determined train scheduling. This study addresses the uncertainty in maintenance activities through including buffer time to the modified scheduling. We also addressed the operational constraints such as speed limit due to maintenance operations in the adjusted scheduling. The result of the model provides railway planners with a modified timetable which includes both maintenance plan and train operations schedules. © 2019 The Authors. Published by Elsevier B.V.
dc.language.isoENen_US
dc.subject.enUncertainty
dc.subject.enMathematical programming
dc.subject.enTrack maintenance
dc.subject.enTrain scheduling
dc.titleDeveloping a train timetable according to track maintenance plans: A stochastic optimization of buffer time schedules
dc.typeArticle de revueen_US
dc.identifier.doi10.1016/j.trpro.2018.12.162en_US
dc.subject.halEconomie et finance quantitative [q-fin]en_US
bordeaux.journalTransportation Research Procediaen_US
bordeaux.page27-34en_US
bordeaux.volume37en_US
bordeaux.hal.laboratoriesGroupe de Recherche en Economie Théorique et Appliquée (GREThA) - UMR 5113en_US
bordeaux.hal.laboratoriesGroupe de Recherche en Economie Théorique et Appliquée (GREThA) - UMR 5113en_US
bordeaux.institutionUniversité de Bordeauxen_US
bordeaux.peerReviewedouien_US
bordeaux.inpressnonen_US
hal.exportfalse
bordeaux.COinSctx_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.title=Developing%20a%20train%20timetable%20according%20to%20track%20maintenance%20plans:%20A%20stochastic%20optimization%20of%20buffer%20time%20schedules&rft.atitle=Developing%20a%20train%20timetable%20according%20to%20track%20maintenance%20plans:%20A%20stochastic%20optimization%20of%20buffer%20time%20schedules&rft.jtitle=Transportation%20Research%20Procedia&rft.date=2019&rft.volume=37&rft.spage=27-34&rft.epage=27-34&rft.eissn=23521457&rft.issn=23521457&rft.au=BABABEIK,%20M.&FARJAD-AMIN,%20M.&KHADEMI,%20N.&BAGHERI,%20M.&ZERGUINI,%20Seghir&rft.genre=article


Fichier(s) constituant ce document

FichiersTailleFormatVue

Il n'y a pas de fichiers associés à ce document.

Ce document figure dans la(les) collection(s) suivante(s)

Afficher la notice abrégée